Single Blade Installation in High Wind Speeds

Projektdetaljer

Beskrivelse

When installing wind turbines, interruption and delay of the installation process due to high wind speeds are a huge cost for the wind industry, especially offshore. This is in contradiction to the turbines being installed in locations with high wind speeds to generate the most power output. The objective of this project is therefore to raise the limit for single blade installation in high wind speeds, by actively controlling the Blade Dragon lifting equipment to counteract wind disturbances.
StatusAfsluttet
Effektiv start/slut dato01/07/201331/12/2016

Samarbejdspartnere

  • Technical University of Denmark (Projektpartner)
  • Liftra ApS (Projektpartner)

Finansiering

  • EUDP: 7.665.877,00 kr.

Fingerprint

Udforsk forskningsemnerne, som dette projekt berører. Disse etiketter er oprettet på grundlag af de underliggende bevillinger/legater. Sammen danner de et unikt fingerprint.