The main objective of this project is to analyze the effect of introducing signs with the general speed limit on rural roads. The study contains of a literature study and a before- and after study with control groups.
The project is carried out by Aalborg University and Rambøll and financed by the Danish Road Directorate. The project is expected finalized ultimo 2017.
The project is carried out by Aalborg University and Rambøll and financed by the Danish Road Directorate. The project is expected finalized ultimo 2017.
Status | Afsluttet |
---|---|
Effektiv start/slut dato | 01/02/2016 → 31/12/2017 |