Realistic Approach for Phasor Measurement Unit Placement: Consideration of Hidden Practical Costs

Zakir Hussain Rather, Zhe Chen, Paul Thøgersen, Per Lund, Brian Kirby

Publikation: Bidrag til tidsskriftTidsskriftartikelForskningpeer review

62 Citationer (Scopus)

Abstract

This paper presents a realistic cost-effectivemodel for optimal placement of phasor measurement units (PMUs) for complete observability of a power system considering practical cost implications. The proposed model considers hidden or otherwise unaccounted practical costs involved in PMU installation. Consideration of these hidden but significant and integral part of total PMU installation costs was inspired from practical experience on a real-life project. The proposedmodel focuses on the minimization of total realistic costs instead of a widely used theoretical concept of a minimal number of PMUs. The proposed model has been applied to IEEE 14-bus, IEEE 24-bus, IEEE 30-bus, New England 39-bus, and large power system of 300 buses and real life Danish grid. A comparison of the presented results with those reported by traditionalmethods has also been shown to justify the effectiveness of the proposed model with regard to its realistic and practical nature.
OriginalsprogEngelsk
TidsskriftI E E E Transactions on Power Delivery
Vol/bind30
Udgave nummer1
Sider (fra-til)3 - 15
Antal sider13
ISSN0885-8977
DOI
StatusUdgivet - feb. 2015