Modeling and solving the constrained multi-items lot-sizing problem with time-varying setup cost

Shenghan Zhou, Yuliang Zhou, Xiaorong Zuo, Yiyong Xiao*, Yang Cheng

*Kontaktforfatter

Publikation: Bidrag til tidsskriftTidsskriftartikelForskningpeer review

5 Citationer (Scopus)

Abstract

The dynamic lot-sizing problem is highly complex and very important for the planning systems of manufacturing enterprises in time-varying environment, where production factors such as the production setup costs, unit storage costs, and production capacities may constantly rise or fall in different planning periods over the entire planning horizon. This paper proposed an extension model of the dynamic multi-product lot-sizing problem considering time-varying production setup cost and with dual constraints on dynamic capacities and resource limits, which carters for the actual situation of modern production and manufacturing systems in time-varying environments. Comparative experiments on synthesized problem instances were conducted by using the AMPL/CPLEX solver, which showed that the new model is efficiently on finding solutions with high qualities and the maximum size of test problems can be more than 500 products.

OriginalsprogEngelsk
TidsskriftChaos, Solitons & Fractals
Vol/bind116
Sider (fra-til)202-207
Antal sider6
ISSN0960-0779
DOI
StatusUdgivet - 1 nov. 2018

Fingeraftryk

Dyk ned i forskningsemnerne om 'Modeling and solving the constrained multi-items lot-sizing problem with time-varying setup cost'. Sammen danner de et unikt fingeraftryk.

Citationsformater