SWEEP Project RAT : Geotechnical Analyses Stage 1

Publikation: ForskningRapport

Vis graf over relationer

This report presents the results from the design analyses made for the clustered suction caisson used as foundation for a Riser Access Tower (RAT). The RAT is intended built next to the K15-FA-1 Platform in the Dutch Sector of the North Sea.
OriginalsprogEngelsk
Udgivelsesdato2010
UdgivelsesstedAalborg
UdgiverAalborg University. Department of Civil Engineering
Antal sider293
StatusUdgivet
SerieDCE Contract Reports
Nummer106

Emneord

  • RAT, Steel Plates, Cross Plates, Seismic Loading, Settlement Analysis, Flow Rate, Soil Pressure, VHM Loads

ID: 49624500