SWEEP Project RAT : Geotechnical Analyses Stage 1
Publikation: Forskning › Rapport
This report presents the results from the design analyses made for the clustered suction caisson used as foundation for a Riser Access Tower (RAT). The RAT is intended built next to the K15-FA-1 Platform in the Dutch Sector of the North Sea.
| Originalsprog | Engelsk |
|---|---|
| Udgivelsesdato | 2010 |
| Udgivelsessted | Aalborg |
|---|---|
| Udgiver | Aalborg University. Department of Civil Engineering |
| Antal sider | 293 |
| Status | Udgivet |
| Serie | DCE Contract Reports |
|---|---|
| Nummer | 106 |
Emneord
- RAT, Steel Plates, Cross Plates, Seismic Loading, Settlement Analysis, Flow Rate, Soil Pressure, VHM Loads
ID: 49624500