This work considers the use of wind turbines for aiding up-regulation of an electrical grid, by employing temporary overproduction with respect to available power. We present a simple model describing a turbine, and show how the possible period of overproduction can be maximized by solving a series of convex problems, where the load is distributed among several turbines in a farm. Thereafter, we present an optimization scheme that guarantees a lower limit for the overproduction period and subsequently propose an adaptive implementation that is robust against parameter uncertainties.
Originalsprog | Engelsk |
---|---|
Tidsskrift | I E E E Transactions on Industrial Electronics |
Vol/bind | 60 |
Udgave nummer | 7 |
Sider (fra-til) | 2851-2863 |
ISSN | 0278-0046 |
DOI | |
Status | Udgivet - 2013 |
Fingeraftryk
Dyk ned i forskningsemnerne om 'Utilization of Wind Turbines for Up-regulation of Power Grids'. Sammen danner de et unikt fingeraftryk.Projekter
- 1 Afsluttet
-
Smart and Cool
Wisniewski, R., Bendtsen, J. D., Stoustrup, J., Leth, J., Juelsgaard, M., Totu, L. C. & Shafiei, S. E.
15/08/2011 → 31/12/2014
Projekter: Projekt › Forskning