Standard

Cost Overruns in Large-scale Transportation Infrastructure Projects : Explanations and Their Theoretical Embeddedness. / Cantarelli, Chantal C; Flyvbjerg, Bent; Molin, Eric J. E; van Wee, Bert.

In: European Journal of Transport and Infrastructure Research, Vol. 10, No. 1, 03.2010, p. 5-18.

Publication: Research - peer-reviewEditorial

Harvard

APA

CBE

MLA

Vancouver

Author

Cantarelli, Chantal C; Flyvbjerg, Bent; Molin, Eric J. E; van Wee, Bert / Cost Overruns in Large-scale Transportation Infrastructure Projects : Explanations and Their Theoretical Embeddedness.

In: European Journal of Transport and Infrastructure Research, Vol. 10, No. 1, 03.2010, p. 5-18.

Publication: Research - peer-reviewEditorial

Bibtex

@article{a2daf9612256453e92a14a3cca5d6383,
title = "Cost Overruns in Large-scale Transportation Infrastructure Projects",
publisher = "Technische Universiteit Delft",
author = "Cantarelli, {Chantal C} and Bent Flyvbjerg and Molin, {Eric J. E} and {van Wee}, Bert",
year = "2010",
volume = "10",
number = "1",
pages = "5--18",
journal = "European Journal of Transport and Infrastructure Research",
issn = "1567-7141",

}

RIS

TY - JOUR

T1 - Cost Overruns in Large-scale Transportation Infrastructure Projects

T2 - Explanations and Their Theoretical Embeddedness

A1 - Cantarelli,Chantal C

A1 - Flyvbjerg,Bent

A1 - Molin,Eric J. E

A1 - van Wee,Bert

AU - Cantarelli,Chantal C

AU - Flyvbjerg,Bent

AU - Molin,Eric J. E

AU - van Wee,Bert

PB - Technische Universiteit Delft

PY - 2010/3

Y1 - 2010/3

JO - European Journal of Transport and Infrastructure Research

JF - European Journal of Transport and Infrastructure Research

SN - 1567-7141

IS - 1

VL - 10

SP - 5

EP - 18

ER -