    Abstract

    Two different analyses have been carried out in order to find the vertical earth pressure, or overburden pressure, at the crown of a tunnel going through a dike. Firstly, a hand calculation is performed using a simple dispersion of the stresses over depth. Secondly, the finite‐element program Plaxis is utilized to check the result.

    Original languageEnglish
    Place of PublicationAalborg
    PublisherDepartment of Civil Engineering, Aalborg University
    Number of pages10
    Publication statusPublished - 2008
    SeriesDCE Contract Reports
    Number46

    Keywords

    • Earth Pressure
    • Tunnel Crown
    • Finite-Element Analysis
    • Hand Calculation
    • Plaxis