Abstract

This paper describes the modelling and simulation of offshore wind power plants (WPP) connected to the onshore power system grid by VSC based HVDC transmission. Offshore wind power plant is modelled with several wind turbine generators connected to two separate collector buses with their own plant step-up transformers. VSC's are modelled using ideal IGBT switches supplied by the gate pulses from their respective controllers.

A sequence of operation has been simulated from the starting up of the VSC-HVDC transmission, energizing the offshore grid and subsequent synchronization of the individual wind turbines. Simulation of power ramping up and down as well as steady state operation has been demonstrated. As an additional case, the primary reserve control logic has been implemented and simulated in PSCAD model.
Original languageEnglish
Title of host publicationProceeding of the 5th Nordic Wind Power Conference : Power System Integration and Electrical Systems of Wind Turbines and Wind Farms
Publication date2009
Publication statusPublished - 2009
EventNordic Wind Power Conference - Rønne, Denmark
Duration: 10 Sept 200911 Sept 2009
Conference number: 5

Conference

ConferenceNordic Wind Power Conference
Number5
Country/TerritoryDenmark
CityRønne
Period10/09/200911/09/2009

Fingerprint

Dive into the research topics of 'Modelling and Simulation of VSC-HVDC Connection for Wind Power Plants'. Together they form a unique fingerprint.

Cite this