Abstract
This paper proposes an optimization algorithm to find the maximum wind installation in a radial distribution network. The algorithm imposes a limit on the amount of wind energy that can be curtailed annually. The algorithm implements
the wind turbine reactive power control and wind energy curtailment using sensitivity factors. The optimization is integrated with Monte Carlo simulation to account for the stochastic behavior of load demand and wind power generation. The proposed algorithm is tested on a real 20 kV Danish distribution system in Støvring. It is demonstrated that the algorithm executes reactive compensation and energy curtailment sequentially in an effective and efficient manner.
the wind turbine reactive power control and wind energy curtailment using sensitivity factors. The optimization is integrated with Monte Carlo simulation to account for the stochastic behavior of load demand and wind power generation. The proposed algorithm is tested on a real 20 kV Danish distribution system in Støvring. It is demonstrated that the algorithm executes reactive compensation and energy curtailment sequentially in an effective and efficient manner.
Original language | English |
---|---|
Title of host publication | Proceedings of the 2nd IEEE PES Innovative Smart Grid Technologies, ISGT-EUROPE 2011 |
Number of pages | 6 |
Publisher | IEEE Press |
Publication date | 2011 |
ISBN (Print) | 978-1-4577-1422-1 |
ISBN (Electronic) | 978-1-4577-1420-7 |
DOIs | |
Publication status | Published - 2011 |
Event | IEEE PES Innovative Smart Grid Technologies, ISGT-EUROPE 2011 - Manchester, United Kingdom Duration: 5 Dec 2011 → 7 Dec 2011 |
Conference
Conference | IEEE PES Innovative Smart Grid Technologies, ISGT-EUROPE 2011 |
---|---|
Country/Territory | United Kingdom |
City | Manchester |
Period | 05/12/2011 → 07/12/2011 |