Projekter pr. år
Projekter
- 21 Afsluttet
- 21 resultater
Søgeresultater
-
Afsluttet
DroC2om: Drone Critical Communications
Sørensen, T. B. & Amorim, R. M. D.
01/09/2017 → 31/08/2019
Projekter: Projekt › Forskning
-
Relay Enhanced Cellular Networks
Teyeb, O. M. & Sørensen, T. B.
19/05/2010 → 31/12/2012
Projekter: Projekt › Forskning
-
Advanced MIMO Receivers
Manchon, C. N., Berardinelli, G., Sørensen, T. B. & E. Mogensen, P.
19/05/2010 → 01/12/2011
Projekter: Projekt › Forskning
-
SAMURAI: <strong>S</strong>pectrum <strong>A</strong>ggregation and <strong>M</strong>ulti-<strong>U</strong>ser MIMO: <strong>R</strong>e<strong>A</strong>l-world <strong>I</strong>mpact: <strong>SAMURAI - EU ID: FP7-INFSO-ICT-248268</strong>
Sørensen, T. B., Cattoni, A. F., Nguyen, H. T., Tonelli, O., Deneire, L. & Berardinelli, G.
01/01/2010 → 30/06/2012
Projekter: Projekt › Forskning
-
Packet data services over UMTS and its Evolution - Objective and Subjective Performance Investigations
E. Mogensen, P., Boussif, M., Teyeb, O. M. & Sørensen, T. B.
31/12/2007 → 31/12/2007
Projekter: Projekt › Forskning
Fil -
Mobility Management and Handover for Beyond 3G and 4G Mobile Communication Systems
Östling, P., Anas, M., Elling, J., E. Mogensen, P., Sørensen, T. B., Pedersen, K. I. & Sørensen, T. B.
31/12/2007 → 31/12/2007
Projekter: Projekt › Forskning
-
1Gbps Air Interface for Local Area Cellular Networks: Long Term Evolution of Optimized TDD-based Cellular Local Area Networks (LA-TDD) under the Framework of future IMT-Advanced Systems
Berardinelli, G., Maestro, L. A., Wang, Y., Frattasi, S., Sørensen, T. B. & E. Mogensen, P.
01/09/2007 → 31/12/2008
Projekter: Projekt › Forskning
-
Self-configurable air interface (SURFACE)
Sørensen, T. B., Figueiredo, D. V. P., Wei, N., Lin, Z. & Wang, Y.
01/01/2006 → 31/12/2008
Projekter: Projekt › Forskning
-
Enhanced uplink packet access in WCDMA
E. Mogensen, P., Rosa, C. & Sørensen, T. B.
31/12/2005 → 31/12/2005
Projekter: Projekt › Forskning
-
Physical Layer Design for B3G/4G considering RF Hardware Imperfections
Priyanto, B. E., Jensen, O. K., Sørensen, T. B., Larsen, T. & E. Mogensen, P.
01/11/2004 → 01/02/2008
Projekter: Projekt › Forskning
-
Downlink multiple access techniques for Beyond 3G and 4G mobile communication systems
Rom, C., Sørensen, T. B. & E. Mogensen, P.
01/10/2004 → 31/12/2008
Projekter: Projekt › Forskning
-
Extension of the ITU Channel Models for Wideband Frequency dependant Systems
E. Mogensen, P. & Sørensen, T. B.
01/09/2004 → 31/12/2007
Projekter: Projekt › Forskning
-
Frequency-Domain Packet Scheduling for UTRAN Long Term Evolution (LTE)
Pokhariyal, A., E. Mogensen, P. & Sørensen, T. B.
01/09/2004 → 31/12/2007
Projekter: Projekt › Forskning
-
Performance Evaluation of Proportional Fair Scheduling Algorithm with Measured Channels
Sørensen, T. B. & E. Mogensen, P.
01/01/2004 → 31/12/2007
Projekter: Projekt › Forskning
-
MIMO techniques for improved 3G cellular network performance
E. Mogensen, P. & Sørensen, T. B.
31/12/2003 → 31/12/2003
Projekter: Projekt › Forskning
-
Advanced Uplink Packet Scheduling for Dedicated Traffic Channels
Sørensen, T. B., Rosa, C., E. Mogensen, P. & Dimou, K.
31/12/2003 → 31/12/2003
Projekter: Projekt › Forskning
-
Advanced Packet Scheduling and QoS differentiation in Uplink Packet Access
Sørensen, T. B., E. Mogensen, P. & Rosa, C.
31/12/2003 → 31/12/2003
Projekter: Projekt › Forskning
-
MIMO techniques for future generation cellular systems (4G)
Wei, N., Sørensen, T. B., E. Mogensen, P. & Kolding, T. E.
01/10/2003 → 31/12/2007
Projekter: Projekt › Forskning
-
Capacity enhancing strategies based on fast packet scheduling
Sørensen, T. B., E. Mogensen, P. & Outes Carnero, J.
30/06/2003 → 30/06/2003
Projekter: Projekt › Forskning
-
Distributed Antenna Systems
E. Mogensen, P. & Sørensen, T. B.
31/12/2001 → 31/12/2001
Projekter: Projekt › Forskning
-
Enhanced Uplink Packet Access in WCDMA
E. Mogensen, P., Rosa, C. & Sørensen, T. B.
01/10/2001 → 31/12/2004
Projekter: Projekt › Forskning