Projektdetaljer
Beskrivelse
The main objective of this project is to provide a detailed feasibility study of the economy, maturity and technical challenges in changing diesel gen-sets of the offshore service fleets with a hybrid battery and fuel cell powered units. Currently, these ships are supplied with 2-4 high velocity 4-strock diesel motors with the size 1-6MW that consume low-sulfur diesel oil. These ships sail normally with 14 days return cycles and therefore they should be equipped with energy stored for at least 14 days.
Akronym | CREW |
---|---|
Status | Afsluttet |
Effektiv start/slut dato | 01/04/2021 → 01/09/2021 |
Samarbejdspartnere
- Esvagt A/S
- Ballard Power Europe A/S
- Siemens
- CS Electric
- MARLOG
Finansiering
- Energy Cluster Denmark: 300.000,00 kr.
FN's verdensmål
I 2015 blev FN-landene enige om 17 verdensmål til at bekæmpe fattigdom, beskytte planeten og sikre velstand for alle. Dette projekt bidrager til følgende verdensmål:
Fingerprint
Udforsk forskningsemnerne, som dette projekt berører. Disse etiketter er oprettet på grundlag af de underliggende bevillinger/legater. Sammen danner de et unikt fingerprint.