Projektdetaljer

Beskrivelse

The main objective of this project is to provide a detailed feasibility study of the economy, maturity and technical challenges in changing diesel gen-sets of the offshore service fleets with a hybrid battery and fuel cell powered units. Currently, these ships are supplied with 2-4 high velocity 4-strock diesel motors with the size 1-6MW that consume low-sulfur diesel oil. These ships sail normally with 14 days return cycles and therefore they should be equipped with energy stored for at least 14 days.
AkronymCREW
StatusAfsluttet
Effektiv start/slut dato01/04/202101/09/2021

Samarbejdspartnere

  • Esvagt A/S
  • Ballard Power Europe A/S
  • Siemens
  • CS Electric
  • MARLOG

Finansiering

  • Energy Cluster Denmark: 300.000,00 kr.

FN's verdensmål

I 2015 blev FN-landene enige om 17 verdensmål til at bekæmpe fattigdom, beskytte planeten og sikre velstand for alle. Dette projekt bidrager til følgende verdensmål:

  • Verdensmål 7 - Bæredygtig energi
  • Verdensmål 9 - Industri, innovation og infrastruktur