Projektdetaljer
Beskrivelse
The aim of the project is to design and develop a mobile light-weight energy storage container solution optimised for working with electric drive systems of harbour cranes. As of today, harbour cranes are powered by diesel engines, but in this project we will design a solution which will ease the transition to electric powered cranes for reduced CO2 and particle emissions. Further, the consortium creates a shared knowledge pool for further electrification of on-shore industrial applications.
Akronym | GESC |
---|---|
Status | Afsluttet |
Effektiv start/slut dato | 03/06/2020 → 31/12/2021 |
Samarbejdspartnere
- HMK Bilcon (leder)
- Shanghai Aowei Technology Development Company, LtD
- Aalborg Havn Logistik A/S
Finansiering
- Clean Cluster: 2.059.000,00 kr.
Fingerprint
Udforsk forskningsemnerne, som dette projekt berører. Disse etiketter er oprettet på grundlag af de underliggende bevillinger/legater. Sammen danner de et unikt fingerprint.