Improved SoiL-cable Interaction mooriNG simulaTiONs

Projektdetaljer

Beskrivelse

Moorings of floating oil and gas (O&G) structures present surprisingly large failure rates. A top solution is a redundancy in the design. However, marine renewables cannot afford such redundancy in the mooring design to obtain a competitive levelised cost of energy (LCOE). The EU-funded ISLINGTON project will reduce uncertainties in the estimated fatigue damage of mooring cables due to soil-cable interaction in the touch-down zone (TDZ) and the economic cost for marine renewables. ISLINGTON will improve the numerical modelling of the cable-soil interaction in the TDZ for mooring cables, generate experimental data for mooring line trenching and perform a numerical investigation of the effect of trenching on the fatigue of mooring cables.
AkronymISLINGTON
StatusIgangværende
Effektiv start/slut dato01/12/202230/11/2024

Samarbejdspartnere

  • Sigma Energy & Marine
  • University of Vigo

Fingerprint

Udforsk forskningsemnerne, som dette projekt berører. Disse etiketter er oprettet på grundlag af de underliggende bevillinger/legater. Sammen danner de et unikt fingerprint.