In this paper, technical challenges for realizing offshore multi-terminal HVDC (MTDC) transmission system in Europe is evaluated. An offshore MTDC topology is projected by interconnecting point-to-point HVDC links with the same voltage level and technology found in south-eastern part of North Sea. Availability analysis is done to evaluate the feasibility of the proposed offshore MTDC topology. As compared to point-to-point (PtP) HVDC link, MTDC operation gives a more secure and reliable system. This paper shows that the proposed MTDC topology can operate 98.36% of the time.
Originalsprog | Engelsk |
---|---|
Titel | Proceedings of 2016 IEEE International Energy Conference (ENERGYCON) |
Forlag | IEEE Press |
Publikationsdato | apr. 2016 |
Sider | 1-6 |
ISBN (Elektronisk) | 978-1-4673-8463-6 |
DOI | |
Status | Udgivet - apr. 2016 |
Begivenhed | IEEE International Energy Conference (ENERGYCON) 2016 - KU Leuven, Leuven, Belgien Varighed: 4 apr. 2016 → 8 apr. 2016 http://www.ieee-energycon2016.org/ |
Konference
Konference | IEEE International Energy Conference (ENERGYCON) 2016 |
---|---|
Lokation | KU Leuven |
Land/Område | Belgien |
By | Leuven |
Periode | 04/04/2016 → 08/04/2016 |
Internetadresse |
Fingeraftryk
Dyk ned i forskningsemnerne om 'An Initial Topology of Multi-terminal HVDC Transmission System in Europe: A Case Study of the North-Sea Region'. Sammen danner de et unikt fingeraftryk.Projekter
- 1 Afsluttet
-
CobraCable: COBRAcable – Multi terminal HVDC-VSC link
Silva, F. M. F. D., Bak, C. L., Irnawan, R. & Guldbæk, B. K.
01/05/2015 → 30/04/2019
Projekter: Projekt › Forskning