T1 - Assembly, transportation, installation and commissioning of offshore wind farms
AU - Asgarpour, M.
PY - 2016
Y1 - 2016
N2 - In this chapter, installation of offshore wind farms is discussed briefly. The installation of offshore wind farms is discussed in four categories corresponding to four main wind farm elements, which are foundations, turbines, substations and cables. For the installation of each category, specialised equipment, vessels and installation methods are necessary. Furthermore, preinstallation activities, such as onshore assembly and offshore transportation, and post-installation activities, such as tests and commissioning are discussed. Precommissioning tests are mandatory to demonstrate proper functionality of turbines and the wind farm as a whole. If all tests are successful, the wind farm can be commissioned and be connected to a grid. In the last section of this chapter, a conclusion is given and innovative offshore installation solutions are described.
AB - In this chapter, installation of offshore wind farms is discussed briefly. The installation of offshore wind farms is discussed in four categories corresponding to four main wind farm elements, which are foundations, turbines, substations and cables. For the installation of each category, specialised equipment, vessels and installation methods are necessary. Furthermore, preinstallation activities, such as onshore assembly and offshore transportation, and post-installation activities, such as tests and commissioning are discussed. Precommissioning tests are mandatory to demonstrate proper functionality of turbines and the wind farm as a whole. If all tests are successful, the wind farm can be commissioned and be connected to a grid. In the last section of this chapter, a conclusion is given and innovative offshore installation solutions are described.
KW - Array cable installation
KW - Export cable installation
KW - Foundation installation
KW - Offshore transportation
KW - Offshore wind farm commissioning
KW - Onshore assembly
KW - Substation installation
KW - Wind turbine installation
UR - http://www.scopus.com/inward/record.url?scp=84969131727&partnerID=8YFLogxK
U2 - 10.1016/B978-0-08-100779-2.00017-9
DO - 10.1016/B978-0-08-100779-2.00017-9
M3 - Book chapter
AN - SCOPUS:84969131727
SN - 9780081007792
T3 - Woodhead Publishing Series in Energy
SP - 527
EP - 541
BT - Offshore Wind Farms
PB - Elsevier
ER -