Assembly, transportation, installation and commissioning of offshore wind farms

M. Asgarpour*

*Kontaktforfatter

    Publikation: Bidrag til bog/antologi/rapport/konference proceedingBidrag til bog/antologiForskningpeer review

    13 Citationer (Scopus)

    Abstract

    In this chapter, installation of offshore wind farms is discussed briefly. The installation of offshore wind farms is discussed in four categories corresponding to four main wind farm elements, which are foundations, turbines, substations and cables. For the installation of each category, specialised equipment, vessels and installation methods are necessary. Furthermore, preinstallation activities, such as onshore assembly and offshore transportation, and post-installation activities, such as tests and commissioning are discussed. Precommissioning tests are mandatory to demonstrate proper functionality of turbines and the wind farm as a whole. If all tests are successful, the wind farm can be commissioned and be connected to a grid. In the last section of this chapter, a conclusion is given and innovative offshore installation solutions are described.

    OriginalsprogEngelsk
    TitelOffshore Wind Farms : Technologies, Design and Operation
    Antal sider15
    ForlagElsevier
    Publikationsdato2016
    Sider527-541
    ISBN (Trykt)9780081007792
    ISBN (Elektronisk)9780081007808
    DOI
    StatusUdgivet - 2016
    NavnWoodhead Publishing Series in Energy
    Nummer92
    ISSN2044-9364

    Fingeraftryk

    Dyk ned i forskningsemnerne om 'Assembly, transportation, installation and commissioning of offshore wind farms'. Sammen danner de et unikt fingeraftryk.

    Citationsformater