Assessment and exemplary solutions for cost reduction in the design and construction process. / Zinzi, Michele; Mattoni, Benedetta; Fasano, Gaetano; Erhorn-Kluttig, Heike; Illner, Micha; Bergmann, Antje; Erhorn, Hans; Mørck, Ove; Balslev-Olesen, Ole; Thomsen, Kirsten Engelund; Wittchen, Kim B.; Zavrl, Marjana Šijanec; Jejčič, Neva; Jačimović, Marko.
2018. 214 s.Publikation: Bog/antologi/afhandling/rapport › Rapport › Forskning
TY - RPRT
T1 - Assessment and exemplary solutions for cost reduction in the design and construction process
AU - Zinzi, Michele
AU - Mattoni, Benedetta
AU - Fasano, Gaetano
AU - Erhorn-Kluttig, Heike
AU - Illner, Micha
AU - Bergmann, Antje
AU - Erhorn, Hans
AU - Mørck, Ove
AU - Balslev-Olesen, Ole
AU - Thomsen, Kirsten Engelund
AU - Wittchen, Kim B.
AU - Zavrl, Marjana Šijanec
AU - Jejčič, Neva
AU - Jačimović, Marko
PY - 2018/10/18
Y1 - 2018/10/18
N2 - Costs associated to energy performance of buildings are generally assessed taking into accounts purchase and installation of materials, components, goods of building and energy system technologies, without taking into account other issues that can significantly impact on the final construction costs. Such additional costs include: design, permits, urbanisation works, organisation and operation of the building site, preliminaries, insurances, final inspections and tests. Analogously, operation costs are generally limited to energy consumption for the different vectors, without taking into account the maintenance costs, whose percentage on total operational costs can be relevant in the long‐term, due to the small energy uses in NZEBs and to the complexity of building technologies and energy systems in high performing buildings.
AB - Costs associated to energy performance of buildings are generally assessed taking into accounts purchase and installation of materials, components, goods of building and energy system technologies, without taking into account other issues that can significantly impact on the final construction costs. Such additional costs include: design, permits, urbanisation works, organisation and operation of the building site, preliminaries, insurances, final inspections and tests. Analogously, operation costs are generally limited to energy consumption for the different vectors, without taking into account the maintenance costs, whose percentage on total operational costs can be relevant in the long‐term, due to the small energy uses in NZEBs and to the complexity of building technologies and energy systems in high performing buildings.