Design of the Ciervana Breakwater: Bilbao

H. F. Burcharth, Peter Frigaard, J. Uzcanga, J. M. Berenguer, B. G. Madrigal, J Villanueva

Publikation: Bidrag til bog/antologi/rapport/konference proceedingKonferenceartikel i proceedingForskning

1046 Downloads (Pure)

Abstract

A major expansion of Port Bilbao includes some 4.5 km of breakwaters in water depths up to 28 metres. Construction cost is approximately 190 mill. USD. The paper presents the lay-out and the cross section of the most exposed breakwater section.
OriginalsprogEngelsk
TitelConference on Coastal Structure and Breakwater : Institution of Civil Engineers, London, April 1995
Antal sider25
Publikationsdato1995
StatusUdgivet - 1995
BegivenhedConference on Coastal Structure and Breakwater - London, Storbritannien
Varighed: 27 apr. 199529 apr. 1995

Konference

KonferenceConference on Coastal Structure and Breakwater
Land/OmrådeStorbritannien
ByLondon
Periode27/04/199529/04/1995

Bibliografisk note

PDF for print: 25 pp.

Emneord

  • Port of Bilbao
  • Breakwaters
  • Ciervana Breakwater
  • Design Wave Tests
  • Hydraulic Model Tests
  • Armour Stability
  • Berms
  • Toe Berms

Fingeraftryk

Dyk ned i forskningsemnerne om 'Design of the Ciervana Breakwater: Bilbao'. Sammen danner de et unikt fingeraftryk.

Citationsformater