Resumé
This report mainly focuses on the experiment results and discussions. Therefore, some details about the measurement are not presented in this report but can be found in the experimental plan made before.
Originalsprog | Engelsk |
---|
Udgivelses sted | Aalborg |
---|---|
Forlag | Department of Civil Engineering, Aalborg University |
Antal sider | 33 |
Status | Udgivet - 2014 |
Navn | DCE Technical reports |
---|---|
Nummer | 182 |
ISSN | 1901-726X |
Fingerprint
Bibliografisk note
Pdf for print: 39 pp.Emneord
- Ventilation
- Diffuse ceiling ventilation
- Building constructions
- Thermally activated building system
- Experimental study
Citer dette
}
Experimental Study of an Integrated System with Diffuse Ceiling Ventilation and Thermally Activated Building Constructions. / Zhang, Chen; Yu, Tao; Heiselberg, Per; Pomianowski, Michal Zbigniew.
Aalborg : Department of Civil Engineering, Aalborg University, 2014. 33 s. (DCE Technical reports; Nr. 182).Publikation: Bog/antologi/afhandling/rapport › Rapport › Forskning
TY - RPRT
T1 - Experimental Study of an Integrated System with Diffuse Ceiling Ventilation and Thermally Activated Building Constructions
AU - Zhang, Chen
AU - Yu, Tao
AU - Heiselberg, Per
AU - Pomianowski, Michal Zbigniew
N1 - Pdf for print: 39 pp.
PY - 2014
Y1 - 2014
N2 - The experiments are carried out in a climate chamber located at the Department of Civil Engineering Aalborg University. The objective of the experiments is to evaluate the performance of the system combining diffuse ceiling ventilation and thermally activated building construction (TABS) in terms of thermal comfort and energy performance. 20 cases with different boundary conditions are conducted varying on climate condition heat load. TABS water temperature and flow rate with or without diffuse ceiling. The energy evaluation includes energy balance of test room and cooling or heating capacity of TABS. And the thermal comfort is analyzed by draught rate vertical temperature gradient and radiant temperature asymmetry. Finally the effect of plenum and diffuse ceiling is discussed.This report mainly focuses on the experiment results and discussions. Therefore, some details about the measurement are not presented in this report but can be found in the experimental plan made before.
AB - The experiments are carried out in a climate chamber located at the Department of Civil Engineering Aalborg University. The objective of the experiments is to evaluate the performance of the system combining diffuse ceiling ventilation and thermally activated building construction (TABS) in terms of thermal comfort and energy performance. 20 cases with different boundary conditions are conducted varying on climate condition heat load. TABS water temperature and flow rate with or without diffuse ceiling. The energy evaluation includes energy balance of test room and cooling or heating capacity of TABS. And the thermal comfort is analyzed by draught rate vertical temperature gradient and radiant temperature asymmetry. Finally the effect of plenum and diffuse ceiling is discussed.This report mainly focuses on the experiment results and discussions. Therefore, some details about the measurement are not presented in this report but can be found in the experimental plan made before.
KW - Ventilation
KW - Diffuse ceiling ventilation
KW - Building constructions
KW - Thermally activated building system
KW - Experimental study
KW - Ventilation
KW - Diffuse ceiling ventilation
KW - Building constructions
KW - Thermally activated building system
KW - Experimental study
M3 - Report
T3 - DCE Technical reports
BT - Experimental Study of an Integrated System with Diffuse Ceiling Ventilation and Thermally Activated Building Constructions
PB - Department of Civil Engineering, Aalborg University
CY - Aalborg
ER -