Field tests experience from 1.6MW/400kWh Li-ion battery energy storage system providing primary frequency regulation service

Maciej Jozef Swierczynski, Daniel Ioan Stroe, Ana-Irina Stan, Remus Teodorescu, Rasmus Lærke, Philip Carne Kjær

Publikation: Bidrag til bog/antologi/rapport/konference proceedingKonferenceartikel i proceedingForskningpeer review

20 Citationer (Scopus)

Resumé

Lithium-ion battery energy storage systems (BESSs) represent suitable alternatives to conventional generating units for providing primary frequency regulation on the Danish market. This paper presents aspects concerning the operation of the BESSs in the Danish energy market while providing upwards primary frequency regulation. Moreover, the paper presents the experience form field tests dedicated to the evaluation of the BESSs’ performance degradation. For this purpose, capacity measurements, Hybrid Pulse Power Characterization (HPPC) measurements, and AC impedance measurements were performed on the BESS demonstrator located in Western Denmark and initial results are introduced and discussed. These measurements can be used to validate models for battery ageing during realistic operation or to develop the diagnostic tools for the BESS.
OriginalsprogEngelsk
TitelProceedings of the 2013 4th IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)
Antal sider5
ForlagIEEE Press
Publikationsdato2013
Sider1-5
ISBN (Elektronisk)978-1-4799-2984-9
DOI
StatusUdgivet - 2013
BegivenhedThe 4th European Innovative Smart Grid Technologies Conference - Copenhagen, Danmark
Varighed: 7 okt. 20139 okt. 2013

Konference

KonferenceThe 4th European Innovative Smart Grid Technologies Conference
LandDanmark
ByCopenhagen
Periode07/10/201309/10/2013

Fingerprint

Energy storage
Aging of materials
Lithium-ion batteries
Degradation

Citer dette

Swierczynski, M. J., Stroe, D. I., Stan, A-I., Teodorescu, R., Lærke, R., & Kjær, P. C. (2013). Field tests experience from 1.6MW/400kWh Li-ion battery energy storage system providing primary frequency regulation service. I Proceedings of the 2013 4th IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe) (s. 1-5). IEEE Press. https://doi.org/10.1109/ISGTEurope.2013.6695277
Swierczynski, Maciej Jozef ; Stroe, Daniel Ioan ; Stan, Ana-Irina ; Teodorescu, Remus ; Lærke, Rasmus ; Kjær, Philip Carne. / Field tests experience from 1.6MW/400kWh Li-ion battery energy storage system providing primary frequency regulation service. Proceedings of the 2013 4th IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe). IEEE Press, 2013. s. 1-5
@inproceedings{d895acd0af45448b96c748e457e88d51,
title = "Field tests experience from 1.6MW/400kWh Li-ion battery energy storage system providing primary frequency regulation service",
abstract = "Lithium-ion battery energy storage systems (BESSs) represent suitable alternatives to conventional generating units for providing primary frequency regulation on the Danish market. This paper presents aspects concerning the operation of the BESSs in the Danish energy market while providing upwards primary frequency regulation. Moreover, the paper presents the experience form field tests dedicated to the evaluation of the BESSs’ performance degradation. For this purpose, capacity measurements, Hybrid Pulse Power Characterization (HPPC) measurements, and AC impedance measurements were performed on the BESS demonstrator located in Western Denmark and initial results are introduced and discussed. These measurements can be used to validate models for battery ageing during realistic operation or to develop the diagnostic tools for the BESS.",
keywords = "Energy Storage, Lithium-ion Battery, Primary Frequency Regulation, Field Test",
author = "Swierczynski, {Maciej Jozef} and Stroe, {Daniel Ioan} and Ana-Irina Stan and Remus Teodorescu and Rasmus L{\ae}rke and Kj{\ae}r, {Philip Carne}",
year = "2013",
doi = "10.1109/ISGTEurope.2013.6695277",
language = "English",
pages = "1--5",
booktitle = "Proceedings of the 2013 4th IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)",
publisher = "IEEE Press",

}

Swierczynski, MJ, Stroe, DI, Stan, A-I, Teodorescu, R, Lærke, R & Kjær, PC 2013, Field tests experience from 1.6MW/400kWh Li-ion battery energy storage system providing primary frequency regulation service. i Proceedings of the 2013 4th IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe). IEEE Press, s. 1-5, The 4th European Innovative Smart Grid Technologies Conference, Copenhagen, Danmark, 07/10/2013. https://doi.org/10.1109/ISGTEurope.2013.6695277

Field tests experience from 1.6MW/400kWh Li-ion battery energy storage system providing primary frequency regulation service. / Swierczynski, Maciej Jozef; Stroe, Daniel Ioan; Stan, Ana-Irina; Teodorescu, Remus; Lærke, Rasmus ; Kjær, Philip Carne.

Proceedings of the 2013 4th IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe). IEEE Press, 2013. s. 1-5.

Publikation: Bidrag til bog/antologi/rapport/konference proceedingKonferenceartikel i proceedingForskningpeer review

TY - GEN

T1 - Field tests experience from 1.6MW/400kWh Li-ion battery energy storage system providing primary frequency regulation service

AU - Swierczynski, Maciej Jozef

AU - Stroe, Daniel Ioan

AU - Stan, Ana-Irina

AU - Teodorescu, Remus

AU - Lærke, Rasmus

AU - Kjær, Philip Carne

PY - 2013

Y1 - 2013

N2 - Lithium-ion battery energy storage systems (BESSs) represent suitable alternatives to conventional generating units for providing primary frequency regulation on the Danish market. This paper presents aspects concerning the operation of the BESSs in the Danish energy market while providing upwards primary frequency regulation. Moreover, the paper presents the experience form field tests dedicated to the evaluation of the BESSs’ performance degradation. For this purpose, capacity measurements, Hybrid Pulse Power Characterization (HPPC) measurements, and AC impedance measurements were performed on the BESS demonstrator located in Western Denmark and initial results are introduced and discussed. These measurements can be used to validate models for battery ageing during realistic operation or to develop the diagnostic tools for the BESS.

AB - Lithium-ion battery energy storage systems (BESSs) represent suitable alternatives to conventional generating units for providing primary frequency regulation on the Danish market. This paper presents aspects concerning the operation of the BESSs in the Danish energy market while providing upwards primary frequency regulation. Moreover, the paper presents the experience form field tests dedicated to the evaluation of the BESSs’ performance degradation. For this purpose, capacity measurements, Hybrid Pulse Power Characterization (HPPC) measurements, and AC impedance measurements were performed on the BESS demonstrator located in Western Denmark and initial results are introduced and discussed. These measurements can be used to validate models for battery ageing during realistic operation or to develop the diagnostic tools for the BESS.

KW - Energy Storage

KW - Lithium-ion Battery

KW - Primary Frequency Regulation

KW - Field Test

UR - http://www.scopus.com/inward/record.url?scp=84893574386&partnerID=8YFLogxK

U2 - 10.1109/ISGTEurope.2013.6695277

DO - 10.1109/ISGTEurope.2013.6695277

M3 - Article in proceeding

SP - 1

EP - 5

BT - Proceedings of the 2013 4th IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)

PB - IEEE Press

ER -

Swierczynski MJ, Stroe DI, Stan A-I, Teodorescu R, Lærke R, Kjær PC. Field tests experience from 1.6MW/400kWh Li-ion battery energy storage system providing primary frequency regulation service. I Proceedings of the 2013 4th IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe). IEEE Press. 2013. s. 1-5 https://doi.org/10.1109/ISGTEurope.2013.6695277