Innovation opportunities from made-to-order gypsum boards in renovation projects: a case study in Denmark

Julia Nussholz, Cristina Toca Pérez, Stephanie Salling, Michael Søgaard Jørgensen, Søren Wandahl

Publikation: Bidrag til tidsskriftKonferenceartikel i tidsskriftForskningpeer review

1 Citationer (Scopus)
31 Downloads (Pure)

Abstract

To reduce embodied emissions and waste in renovation projects, new resource efficient and low waste construction processes are needed. One possible solution to reduce waste at the construction can be made-to-order (MTO) customisation of standard products that are delivered in the right size and quantity. A key construction process in renovation projects is the installation of gypsum for partition wall construction. Today, gypsum boards are cut to the right size at the construction site, resulting in 15-30% of waste. In several countries, pilots for delivering MTO gypsum boards in the right length for the building dimension have shown significant potential to reduce waste and increase productivity. This study aims to help the material manufacturer Saint-Gobain Denmark explore innovation opportunities from MTO gypsum boards for the Danish market. Work sampling at a renovation project is conducted to identify the activities of the current installation process and potential time savings from MTO. Interviews are used to identify actors and their roles in the current value chain for partition wall construction in Denmark and possible scenarios to offer MTO. Results show that a rise in the production time from 31% to 36% could be achieved by avoiding measuring and cutting of boards at the construction side. Two value chain scenarios for delivering MTO in the Danish market are presented. Based on the results, potential drivers and barriers for MTO in the Danish market are discussed.

OriginalsprogEngelsk
Artikelnummer012057
TidsskriftIOP Conference Series: Earth and Environmental Science
Vol/bind1085
Udgave nummer1
Antal sider11
ISSN1755-1307
DOI
StatusUdgivet - 2022
BegivenhedSBE 2022 Delft Conference on Innovations for the Urban Energy Transition: Preparing for the European Renovation Wave - Delft, Holland
Varighed: 11 nov. 202213 nov. 2022

Konference

KonferenceSBE 2022 Delft Conference on Innovations for the Urban Energy Transition: Preparing for the European Renovation Wave
Land/OmrådeHolland
ByDelft
Periode11/11/202213/11/2022

Bibliografisk note

Funding Information:
This research received funding from Realdania and the Danish Innovation Fund. The lead author would like to thank Martha Goriatcheff-Madsen and Elisabeth Heimdal Wærsted for their help to collect data.

Publisher Copyright:
© Published under licence by IOP Publishing Ltd.

Fingeraftryk

Dyk ned i forskningsemnerne om 'Innovation opportunities from made-to-order gypsum boards in renovation projects: a case study in Denmark'. Sammen danner de et unikt fingeraftryk.

Citationsformater