Islanded Operation of Offshore Wind Power Plant using IBESS

Sanjay K. Chaudhary, Remus Teodorescu, Jan R. Svensson, Lukasz Kocewiak, Philip Johnson, Bertil Berggren

Publikation: Bidrag til bog/antologi/rapport/konference proceedingKonferenceartikel i proceedingForskningpeer review

6 Citationer (Scopus)
42 Downloads (Pure)

Abstract

The share of renewables in the power system is increasing rapidly. Large offshore wind power plants (OWPPs) are developed at a high pace and conventional fossil fuel-based plants are decommissioned. If the OWPP gets islanded due to any contingency or in the event of a blackout, the whole OWPP will be shutdown. This paper proposes a STATCOM with a battery storage that is located at the point of common connection to an OWPP to enable OWPP energization from a fully discharged state to operate in islanded mode. The STATCOM functionality provides fast and dynamic reactive power management and the battery unit provides active power balancing capability to regulate the frequency in the island. The concept is demonstrated through time-domain simulations on an OWPP model in PSCAD. The results confirm the technical feasibility of the system.
OriginalsprogEngelsk
TitelIslanded Operation of Offshore Wind Power Plant using IBESS
UdgivelsesstedWashington, DC, USA
ForlagIEEE
Publikationsdato26 jul. 2021
Sider1-5
ISBN (Trykt)978-1-6654-4630-3
ISBN (Elektronisk)978-1-6654-0507-2
DOI
StatusUdgivet - 26 jul. 2021
Begivenhed2021 IEEE Power & Energy Society General Meeting (PESGM) - Washington DC, USA
Varighed: 26 jul. 202129 jul. 2021

Konference

Konference2021 IEEE Power & Energy Society General Meeting (PESGM)
Land/OmrådeUSA
ByWashington DC
Periode26/07/202129/07/2021
NavnIEEE Power and Energy Society General Meeting
ISSN1944-9925

Fingeraftryk

Dyk ned i forskningsemnerne om 'Islanded Operation of Offshore Wind Power Plant using IBESS'. Sammen danner de et unikt fingeraftryk.

Citationsformater