Projekter pr. år
Abstract
Slugging flow in the offshore oil & gas production attracts lot of attention due to it's limitation of production rate, periodic overload on processing facilities, and even direct cause of emergency shutdown. This work aims at two correlated objectives: (i) Preventing slugging flow; and meanwhile, (ii) maximizing the production rate at the riser of an offshore production platform, by manipulating a topside choke valve through a learning switching model-free PID controller. The results show good steady-state performance, though a long settling time due to the unknown reference for no slugging flow.
Originalsprog | Engelsk |
---|---|
Titel | Proceedings of the 19th World Congress of the International Federation of Automatic Control, IFAC 2014 |
Antal sider | 6 |
Forlag | IFAC Publisher |
Publikationsdato | aug. 2014 |
Sider | 8522-8527 |
DOI | |
Status | Udgivet - aug. 2014 |
Begivenhed | 19th World Congress of the International Federation of Automatic Control, IFAC 2014 - Cape Town, Sydafrika Varighed: 24 aug. 2014 → 29 aug. 2014 |
Konference
Konference | 19th World Congress of the International Federation of Automatic Control, IFAC 2014 |
---|---|
Land/Område | Sydafrika |
By | Cape Town |
Periode | 24/08/2014 → 29/08/2014 |
Navn | I F A C Workshop Series |
---|---|
ISSN | 1474-6670 |
Fingeraftryk
Dyk ned i forskningsemnerne om 'Learning control for riser-slug elimination and production-rate optimization for an offshore oil and gas production process'. Sammen danner de et unikt fingeraftryk.Projekter
- 1 Afsluttet
-
PDPWAC: Plant-wide De-oiling of Produced Water using Advanced Control
Yang, Z. (Projektleder), Pedersen, S. (Projektdeltager), Durdevic, P. (Projektdeltager), Pedersen, J. K. (Projektdeltager), N. Soltani, M. (Projektdeltager), Stigkær, J. P. (Projektdeltager), Aillos, A. (Projektdeltager), Løhndorf, B. (Projektdeltager) & Sørensen, P. (Projektdeltager)
22/04/2013 → 31/12/2016
Projekter: Projekt › Forskning