Abstract
This paper discusses studies concerning cable modelling for long high voltage AC cable lines. In investigating the possibilities of using long cables instead of overhead lines, the simulation results must be trustworthy. Therefore a model validation is of great importance. This paper describes field test setups and measurements on an already installed cable line with several cross bonding points. These measurements are to be used for cable model validation, which are prepared using simulations. The proposed field tests should be used to validate the cable model for overvoltage problems. The verification shall be done both in the frequency domain and in the time domain.
Originalsprog | Engelsk |
---|---|
Titel | Proceedings of the International Conference on Power Systems Transients (IPST 2009) |
Antal sider | 7 |
Publikationsdato | 2009 |
Status | Udgivet - 2009 |
Begivenhed | International Conference on Power Systems Transients (IPST 2009) - Kyoto, Japan Varighed: 2 jun. 2009 → 6 jul. 2009 |
Konference
Konference | International Conference on Power Systems Transients (IPST 2009) |
---|---|
Land/Område | Japan |
By | Kyoto |
Periode | 02/06/2009 → 06/07/2009 |