This paper focuses on presenting part of the findings from a research project completed in the period of 2009-2013.The research project was funded by the Danish Building & Property Agency with the primary aim to identify and measure the economic effects of using ICT/BIM in construction projects. Firstly, this paper presents a conceptual evaluation method developed in order to define and describe how case studies focusing on use of ICT/BIM in construction projects could be completed in order to measure (both quantitatively and qualitatively) the effects achieved from using ICT/BIM in construction projects. In this context effects are defined both as tangible and intangible effects (both economically and non-economically) directly and/or indirectly as a consequence of using ICT/BIM in a construction project. Secondly, the paper presents and analyses findings achieved from completing four case studies in Denmark, with focus on the method and how it effectively can be used to complete case studies documenting the effects of using ICT/BIM in construction projects. The case studies completed involved construction projects in which the participating companies were client consultants, architects, consulting engineers or contractors. Participating companies were of different sizes and construction projects were at different stages, including the design, construction and operation stage. The findings presented in the paper are firstly that using the developed evaluation method to document the effects of using ICT/BIM in construction projects requires extensive efforts in documenting and tracing the contextual conditions for achieving the effects in order to fully understand the value of using ICT/BIM in construction projects. Secondly, the findings indicate that using ICT/BIM in construction projects has a significant impact on the processes completed in both design and construction and that an advanced field-study approach is necessary in order to be able to measure the effects.
OriginalsprogEngelsk
TitelProceedings of the 33rd CIB W78 Conference 2016
Antal sider11
Publikationsdato1 nov. 2016
StatusUdgivet - 1 nov. 2016
BegivenhedCIB W78 Conference 2016, Oct. 31st – Nov. 2nd 2016, Brisbane, Australia - Quensland University of Technology, Brisbane, Australien
Varighed: 31 okt. 20162 nov. 2016

Konference

KonferenceCIB W78 Conference 2016, Oct. 31st – Nov. 2nd 2016, Brisbane, Australia
LokationQuensland University of Technology
LandAustralien
ByBrisbane
Periode31/10/201602/11/2016

Fingerprint

Economic and social effects
Contractors
Industry
Engineers

Emneord

  • Case Studies
  • BIM
  • Costs
  • Benefits

Citer dette

Lambrecht, J. F., Vestergaard, F., Karlshøj, J., Hauch, P., & Mouritsen, J. (2016). Measuring the effects of using ICT/BIM in construction projects. I Proceedings of the 33rd CIB W78 Conference 2016
Lambrecht, Jan Fuglsig ; Vestergaard, Flemming ; Karlshøj, Jan ; Hauch, Peter ; Mouritsen, Jan. / Measuring the effects of using ICT/BIM in construction projects. Proceedings of the 33rd CIB W78 Conference 2016. 2016.
@inproceedings{6239b43a1ef44d97ac66116eb1bc0a2d,
title = "Measuring the effects of using ICT/BIM in construction projects",
abstract = "his paper focuses on presenting part of the findings from a research project completed in the period of 2009-2013.The research project was funded by the Danish Building & Property Agency with the primary aim to identify and measure the economic effects of using ICT/BIM in construction projects. Firstly, this paper presents a conceptual evaluation method developed in order to define and describe how case studies focusing on use of ICT/BIM in construction projects could be completed in order to measure (both quantitatively and qualitatively) the effects achieved from using ICT/BIM in construction projects. In this context effects are defined both as tangible and intangible effects (both economically and non-economically) directly and/or indirectly as a consequence of using ICT/BIM in a construction project. Secondly, the paper presents and analyses findings achieved from completing four case studies in Denmark, with focus on the method and how it effectively can be used to complete case studies documenting the effects of using ICT/BIM in construction projects. The case studies completed involved construction projects in which the participating companies were client consultants, architects, consulting engineers or contractors. Participating companies were of different sizes and construction projects were at different stages, including the design, construction and operation stage. The findings presented in the paper are firstly that using the developed evaluation method to document the effects of using ICT/BIM in construction projects requires extensive efforts in documenting and tracing the contextual conditions for achieving the effects in order to fully understand the value of using ICT/BIM in construction projects. Secondly, the findings indicate that using ICT/BIM in construction projects has a significant impact on the processes completed in both design and construction and that an advanced field-study approach is necessary in order to be able to measure the effects.",
keywords = "Case Studies, BIM, Costs, Benefits",
author = "Lambrecht, {Jan Fuglsig} and Flemming Vestergaard and Jan Karlsh{\o}j and Peter Hauch and Jan Mouritsen",
year = "2016",
month = "11",
day = "1",
language = "English",
booktitle = "Proceedings of the 33rd CIB W78 Conference 2016",

}

Lambrecht, JF, Vestergaard, F, Karlshøj, J, Hauch, P & Mouritsen, J 2016, Measuring the effects of using ICT/BIM in construction projects. i Proceedings of the 33rd CIB W78 Conference 2016. CIB W78 Conference 2016, Oct. 31st – Nov. 2nd 2016, Brisbane, Australia, Brisbane, Australien, 31/10/2016.

Measuring the effects of using ICT/BIM in construction projects. / Lambrecht, Jan Fuglsig; Vestergaard, Flemming; Karlshøj, Jan; Hauch, Peter; Mouritsen, Jan.

Proceedings of the 33rd CIB W78 Conference 2016. 2016.

Publikation: Bidrag til bog/antologi/rapport/konference proceedingKonferenceartikel i proceedingForskningpeer review

TY - GEN

T1 - Measuring the effects of using ICT/BIM in construction projects

AU - Lambrecht, Jan Fuglsig

AU - Vestergaard, Flemming

AU - Karlshøj, Jan

AU - Hauch, Peter

AU - Mouritsen, Jan

PY - 2016/11/1

Y1 - 2016/11/1

N2 - his paper focuses on presenting part of the findings from a research project completed in the period of 2009-2013.The research project was funded by the Danish Building & Property Agency with the primary aim to identify and measure the economic effects of using ICT/BIM in construction projects. Firstly, this paper presents a conceptual evaluation method developed in order to define and describe how case studies focusing on use of ICT/BIM in construction projects could be completed in order to measure (both quantitatively and qualitatively) the effects achieved from using ICT/BIM in construction projects. In this context effects are defined both as tangible and intangible effects (both economically and non-economically) directly and/or indirectly as a consequence of using ICT/BIM in a construction project. Secondly, the paper presents and analyses findings achieved from completing four case studies in Denmark, with focus on the method and how it effectively can be used to complete case studies documenting the effects of using ICT/BIM in construction projects. The case studies completed involved construction projects in which the participating companies were client consultants, architects, consulting engineers or contractors. Participating companies were of different sizes and construction projects were at different stages, including the design, construction and operation stage. The findings presented in the paper are firstly that using the developed evaluation method to document the effects of using ICT/BIM in construction projects requires extensive efforts in documenting and tracing the contextual conditions for achieving the effects in order to fully understand the value of using ICT/BIM in construction projects. Secondly, the findings indicate that using ICT/BIM in construction projects has a significant impact on the processes completed in both design and construction and that an advanced field-study approach is necessary in order to be able to measure the effects.

AB - his paper focuses on presenting part of the findings from a research project completed in the period of 2009-2013.The research project was funded by the Danish Building & Property Agency with the primary aim to identify and measure the economic effects of using ICT/BIM in construction projects. Firstly, this paper presents a conceptual evaluation method developed in order to define and describe how case studies focusing on use of ICT/BIM in construction projects could be completed in order to measure (both quantitatively and qualitatively) the effects achieved from using ICT/BIM in construction projects. In this context effects are defined both as tangible and intangible effects (both economically and non-economically) directly and/or indirectly as a consequence of using ICT/BIM in a construction project. Secondly, the paper presents and analyses findings achieved from completing four case studies in Denmark, with focus on the method and how it effectively can be used to complete case studies documenting the effects of using ICT/BIM in construction projects. The case studies completed involved construction projects in which the participating companies were client consultants, architects, consulting engineers or contractors. Participating companies were of different sizes and construction projects were at different stages, including the design, construction and operation stage. The findings presented in the paper are firstly that using the developed evaluation method to document the effects of using ICT/BIM in construction projects requires extensive efforts in documenting and tracing the contextual conditions for achieving the effects in order to fully understand the value of using ICT/BIM in construction projects. Secondly, the findings indicate that using ICT/BIM in construction projects has a significant impact on the processes completed in both design and construction and that an advanced field-study approach is necessary in order to be able to measure the effects.

KW - Case Studies

KW - BIM

KW - Costs

KW - Benefits

M3 - Article in proceeding

BT - Proceedings of the 33rd CIB W78 Conference 2016

ER -

Lambrecht JF, Vestergaard F, Karlshøj J, Hauch P, Mouritsen J. Measuring the effects of using ICT/BIM in construction projects. I Proceedings of the 33rd CIB W78 Conference 2016. 2016