Abstract
The present invention relates to a method for installation and validation of a screw pile (100) being installed in the ground, said method comprising the steps of: placing at least one screw pile at a location, providing means for screwing (200) the at least one screw pile into the ground, starting screwing the at least one screw pile into the ground by the means for screwing, during the process of screwing measuring at least a set of installation parameters comprising: torsion and/or torque and penetration depth, generating an output indicative of said installation parameters, and providing an installation validation, e.g. an installation validation document or file, of the at least one screw pile. In some embodiments the method comprises to stop screwing the screw pile into the ground when predetermined thresholds of installation parameters are reached. In some embodiments the method comprises generating a data on how the screw pile was installed, e.g. screw direction and rotation versus penetration depth data, e.g. to be included as part of the installation validation. Furthermore, the present invention relates to an installation validation document for at least one screw pile installed in the ground, moreover the invention relates to a computer program.
Originalsprog | Engelsk |
---|---|
IPC | E02D 5/56 2006.1,E02D 7/22 2006.1 |
Patentnummer | WO/2023/180295 |
Journaliseringsdato | 21/03/2023 |
Land/Område | Danmark |
Prioritetsdato | 21/03/2022 |
Prioritetsnummer | PA202270115 |
Status | Udgivet - 28 sep. 2023 |
Emneord
- Patent
- Skruepæle