Modelling User-Costs in Life Cycle Cost-Benefit (LCCB) analysis

Palle Thoft-Christensen

    Publikation: Bidrag til bog/antologi/rapport/konference proceedingKonferenceartikel i proceedingForskningpeer review

    251 Downloads (Pure)

    Abstract

    The importance of including user's costs in Life-Cycle Cost-Benefit analysis of structures is discussed in this paper. This is especially for bridges of great importance. Repair or/and failure of a bridge will usually result in user costs greater than the repair or replacement costs of the bridge. For the society (and the user's) it is therefore of great importance that maintenance or replacement of a bridge is performed in such a way that all costs are minimized - not only the owners cost.
    OriginalsprogEngelsk
    TitelProceedings IFIP WG7.5 Conference on Reliability and Optimization of Structural Systems
    Antal sider10
    ForlagThe IFIP International Conference on Research and Practical Issues of Enterprise Information Systems
    Publikationsdato2008
    StatusUdgivet - 2008
    BegivenhedIFIP WG7.5 Conference on Reliability and Optimization of Structural Systems - Toluca, Mexico
    Varighed: 6 aug. 20089 aug. 2008

    Konference

    KonferenceIFIP WG7.5 Conference on Reliability and Optimization of Structural Systems
    Land/OmrådeMexico
    ByToluca
    Periode06/08/200809/08/2008

    Fingeraftryk

    Dyk ned i forskningsemnerne om 'Modelling User-Costs in Life Cycle Cost-Benefit (LCCB) analysis'. Sammen danner de et unikt fingeraftryk.

    Citationsformater