Offshore Substation Locating in Wind Farms Based on Prim Algorithm

Peng Hou, Weihao Hu, Zhe Chen

Publikation: Bidrag til bog/antologi/rapport/konference proceedingKonferenceartikel i proceedingForskningpeer review

20 Citationer (Scopus)

Abstract

The investment of offshore wind farm is large while the cost on electrical system can take up to 15% of the total costs. In order to reduce the cost, it is desirable to optimize the electrical system layout in design phase. Since the location of offshore substation (OS) is highly related to the electrical system layout, the optimal layout design work should be done with the consideration of the impact of the location of offshore substation on the submarine cable connection layout to minimize the investment of cables. This paper addresses a new method to optimize the OS location together with the cable connection layout. The results show that the proposed method is an effective way for offshore wind farm cable connection layout design.
OriginalsprogEngelsk
TitelProceedings of the IEEE Power & Energy Society General Meeting, PES 2015
Antal sider5
ForlagIEEE Press
Publikationsdatojul. 2015
Sider1-5
ISBN (Trykt)978-1-4673-8040-9
DOI
StatusUdgivet - jul. 2015
BegivenhedIEEE Power & Energy Society General Meeting, PES 2015 - Sheraton Denver Downtown Hotel 1550 Court Place, Denver, Colorado, USA
Varighed: 26 jul. 201530 jul. 2015

Konference

KonferenceIEEE Power & Energy Society General Meeting, PES 2015
LokationSheraton Denver Downtown Hotel 1550 Court Place
Land/OmrådeUSA
ByDenver, Colorado
Periode26/07/201530/07/2015

Fingeraftryk

Dyk ned i forskningsemnerne om 'Offshore Substation Locating in Wind Farms Based on Prim Algorithm'. Sammen danner de et unikt fingeraftryk.

Citationsformater