Abstract
Guidance on selection of breakwater types and related design safety levels for breakwaters are almost non-existent, which is the reason that PIANC has initiated working group 47 on this subject. This paper presents ongoing work particulary on the Icelandic type berm breakwater within the PIANC working group. It will concentrate on design guidance and on the optimum safety levels for this type of structure.
Originalsprog | Engelsk |
---|---|
Titel | Coastal Structures '07 : Book of Abstracts : International Conference 2-4 July, Venice, Italy |
Redaktører | L. Franco, P. Ruol, G.R. Tomasicchio, A. Lamberti |
Antal sider | 1 |
Forlag | American Society of Civil Engineers |
Publikationsdato | 2007 |
Sider | 34 |
ISBN (Trykt) | 8889405058 |
Status | Udgivet - 2007 |
Begivenhed | The International Conference of Coastal Structures - Venice, Italien Varighed: 2 jul. 2007 → 4 jul. 2007 Konferencens nummer: 5 |
Konference
Konference | The International Conference of Coastal Structures |
---|---|
Nummer | 5 |
Land/Område | Italien |
By | Venice |
Periode | 02/07/2007 → 04/07/2007 |
Emneord
- Optimum Safety Levels
- Breakwaters
- Berm Breakwaters
- Design Rules