Power Production Experience from Wave Dragon Prototype Testing in Nissum Bredning: 2003 to 2005 – summary note

Peter Frigaard, Jens Peter Kofoed

Publikation: Bog/antologi/afhandling/rapportRapportForskning

617 Downloads (Pure)

Abstract

The first Wave Dragon prototype power production testing started May 2003 and ended temporarily primo 2005. In the mentioned period Wave Dragon was situated in a corner of Nissum Bredning with relative little amount of wave energy. Main purpose of the tests was demonstration of survivability and availability.
OriginalsprogEngelsk
UdgivelsesstedAalborg
ForlagDepartment of Civil Engineering, Aalborg University
Antal sider6
StatusUdgivet - 2005
NavnHydraulics and Coastal Engineering
Nummer34
ISSN1603-9874

Bibliografisk note

PDF for print: 8 pp.

Emneord

  • Wave Dragon
  • Wave Energy
  • Energy Converters
  • Nissum Bredning

Fingeraftryk

Dyk ned i forskningsemnerne om 'Power Production Experience from Wave Dragon Prototype Testing in Nissum Bredning: 2003 to 2005 – summary note'. Sammen danner de et unikt fingeraftryk.

Citationsformater