This report covers a preliminary analysis of mooring solutions candidates for four large floating wave energy converters. The work is part of the EUDP project “Mooring Solutions for Large Wave Energy Converters” and is the outcome of "Work Package 3: Preliminary Analysis". The report further compose the "Milestone 4: Report on results of preliminary analysis and selection of final candidates.
The report is produced by Aalborg University with input from the partner WECs Floating Power Plant, KNSwing, LEANCON and Wave Dragon. Tension Technology International (TTI) has provided a significant part of the report in terms of buildability concers and cost input. The report was presented and discussed at a workshop in Copenhagen in June 2016.
The report is produced by Aalborg University with input from the partner WECs Floating Power Plant, KNSwing, LEANCON and Wave Dragon. Tension Technology International (TTI) has provided a significant part of the report in terms of buildability concers and cost input. The report was presented and discussed at a workshop in Copenhagen in June 2016.
Originalsprog | Engelsk |
---|
Udgivelsessted | Aalborg |
---|---|
Forlag | Department of Civil Engineering, Aalborg University |
Antal sider | 53 |
Status | Udgivet - 2018 |
Navn | DCE Technical reports |
---|---|
Nummer | 241 |
ISSN | 1901-726X |
Fingeraftryk
Dyk ned i forskningsemnerne om 'Preliminary Analysis and Selection of Mooring Solution Candidates: M4 & WP3'. Sammen danner de et unikt fingeraftryk.Projekter
- 1 Afsluttet
-
Forankringsløsninger for store bølgekraftanlæg
Kofoed, J. P., Thomsen, J. B., Kramer, M. B., Ferri, F. & Pecher, A.
01/07/2014 → 30/06/2018