Projekter pr. år
Abstract
The purpose of the document is to initialise Task 3.2 Technical Evaluation by carrying out the first part of the system evaluation. The document describes the evaluation plans that will be followed to determine whether the ISISEMD system requirements are fulfilled by testing services after the components of the system have been integrated in one system. These evaluation plans will serve as a guideline to the system technical evaluation of the ISISEMD integrated prototype.
Originalsprog | Engelsk |
---|
Antal sider | 38 |
---|---|
Status | Udgivet - 2010 |
Fingeraftryk
Dyk ned i forskningsemnerne om 'WP3 – ISISEMD Integrated Prototype Evaluation Plan'. Sammen danner de et unikt fingeraftryk.Projekter
- 1 Afsluttet
-
ISISEMD: ISISEMD
Peterson, C. B. (Projektdeltager), Iversen, T. P. N. (Projektdeltager), Mitseva, A. (Andet), Marchetti, N. (Projektdeltager), Anggorojati, B. (Projektdeltager), Cetin, K. (Projektdeltager), Prasad, N. R. (Projektdeltager), Kyriazakos, S. (Projektleder) & Dinesen, B. (Projektdeltager)
01/03/2009 → 01/09/2011
Projekter: Projekt › Forskning