Projects per year
Fingerprint
The fingerprint consists of automatically generated concepts related to the associated persons. It is updated automatically, when new content is added.
- 1 Similar Profiles
Collaborations from the last five years
Dive into details by clicking on the dots.
Projects
- 1 Active
-
Simplified procedures of estimating seismically induced settlement for pile-supported jacket structure
Yimo, W. (PI)
15/08/2022 → 14/08/2025
Project: PhD Project
-
Simplified Equivalent Model for Seismic Centrifuge Testing of Offshore Wind Turbine Jacket Foundations
Wu, Y., Lashgari, A., Barari, A. & Ibsen, L. B., Jun 2025, 5th International Symposium on Frontiers in Offshore Geotechnics . International Society for Soil Mechanics and Geotechnical Engineering, 8 p. 85Research output: Contribution to book/anthology/report/conference proceeding › Article in proceeding › Research › peer-review
Open AccessFile1 Downloads (Pure) -
A comparison between static and dynamic load tests of Tapered steel jacking piles in Baskarp sand
Zhou, J., Wu, Y., Ibsen, L. B. & Barari, A., 2 Jul 2024, In: E3S Web of Conferences. 544, 10009.Research output: Contribution to journal › Conference article in Journal › Research › peer-review
Open AccessFile26 Downloads (Pure) -
A comparison between static and dynamic load tests of Tapered steel jacking piles in Baskarp sand
Zhou, J., Yimo, W., Ibsen, L. B. & Barari, A., 2023, Proceedings of the 8th International Symposium on Deformation Characteristics of Geomaterials (ISDCG2023). International Society for Soil Mechanics and Geotechnical Engineering, 7 p.Research output: Contribution to book/anthology/report/conference proceeding › Article in proceeding › Research › peer-review
Open AccessFile54 Downloads (Pure)