Effektivisering af bølgeenergi vha. tryksatte cyklontanke

Project Details

Description

The purpose of the project is to develop a pressurized oil reservoir including a cyclone part, to reduce the need for booster circuitry in Wave Energy Converters (WECs) and hereby lower the cost of energy (CoE) for WECs. Included in the design is a cyclone part, that is part of the filtering system used to separate debris from the oil. The goal of the project is to hereby simplify the PTO system design and increase PTO-system efficiency by approx. 5%, while reducing wear and maintenance of the plants. It is expected that the concept/technology may be transferred to other industries and systems that require a pressurized low pressure line.
StatusFinished
Effective start/end date01/09/201501/06/2017

Funding

  • EUDP: DKK3,593,653.00

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.