Project Details

Description

100 kW EXOWAVE wave energy testing in Hanstholm.

Key findings

• Design, build and demonstrate an Exowave wave energy converter (WEC) block at a 14-meter water depth in the Danish North Sea in conjunction with a hydro turbine driven electrical generator connected to the grid. The power generation would be +100 kW.
• Include learnings from EUDP1: numerical model verified by tank test (AAU) and CFD analysis (Delft University), feasibility study: wind and wave plant in very large scale, WEC detailed design and engineering, FAT and demonstration at DanWEC site.
• Assess the environmental impact and improve animal life by shaping the WEC foundation for fish breeding grounds.
• Life cycle analysis and include eco-friendly materials as waste materials from wind turbine blade waste materials.
• Assess supply chain in the North Sea region with special focus in Denmark and its raw material, production facilities, knowledge provider for fulfilling the aim above LOI target and support the Dan-ish national energy target in 2030 and 2050. And to include the results in the design phase. The overall KPI here is to lower LCOE.
• TRL improve from 6 to 7
StatusActive
Effective start/end date01/11/202231/10/2024