CIP project group: PhD Student Claus Hoé Seiding, Professor John Johansen (primary advisor) Project duration: 2004 ? 2007 The project is based on the hypothesis that lead time has a close correlation with complexity when dealing with planning and production systems. The project looks to analyze and identify the effect of reduced lead time. The goal is to be able to draw out the results of the analysis and implement it into guidelines and econometric models, which should support the right focus on lead time in situations of decision making.