Project Details
Description
The project purpose is to develop an intelligent energy management system for Virtual Power Plant in order to improve production forecast, reduce fluctuations of output power over time (dp/dt), offer the balancing responsible qualify by TSO as primary reserve, improve inertia response, enable black starting and finally demonstrate that an optimal designed energy management system with minimised energy storage integrated into a wind power plant results in a financially attractive concept. The resources includes: 2 PhD students, 1 PostDoc 3 years.
Status | Finished |
---|---|
Effective start/end date | 01/09/2010 → 30/09/2013 |
Collaborative partners
- Vestas Wind Systems AS (Project partner)
Funding
- The Danish National Advanced Technology Foundation: DKK530,000.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.