Project Details
Description
This project aimed at analyzing the full-scale operation of a novel two-pipe system, which was installed for the first time in a real building in Jönköping, Sweden. Aspects such as indoor climate and energy performance of the system were investigated.
Acronym | SOLUS (experimental analysis) |
---|---|
Status | Finished |
Effective start/end date | 01/10/2016 → 30/09/2018 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.