A multistage coordinative optimization for sitting and sizing P2G plants in an integrated electricity and natural gas system

  • Q. Zeng
  • , J. Fang
  • , Z. Chen
  • , J. Li
  • , B. Zhang

Research output: Contribution to book/anthology/report/conference proceeding › Article in proceeding › Research › peer-review

Abstract

Power-to-Gas (P2G) allows for the large scale energy storage which provides a big potential to accommodate the rapid growth of the renewables. In this paper, a long-term optimization model for the co-planning of the electricity and natural gas systems is presented. The P2G Plants are optimally sited and sized in the integrated energy system. The problem model is formulated as a multi-stage integer nonlinear optimization. The objective is to minimize the investment plus operation costs by determining the optimal location, capacity, and installation time of P2G. Case studies are simulated to illustrate the proposed approach.
Original languageEnglish
Title of host publicationProceedings of the 2016 IEEE International Energy Conference (ENERGYCON)
Number of pages6
PublisherIEEE Press
Publication dateJul 2016
Article number7514061
ISBN (Electronic)978-1-4673-8463-6
DOIs
Publication statusPublished - Jul 2016
Event2016 IEEE International Energy Conference (ENERGYCON) - Leuven, Belgium
Duration: 4 Apr 2016 → 8 Apr 2016

Conference

Conference2016 IEEE International Energy Conference (ENERGYCON)
Country/TerritoryBelgium
CityLeuven
Period04/04/2016 → 08/04/2016

Keywords

  • Electric power system
  • Integrated gas and electricity system
  • Natural gas network
  • Optimal planning
  • Power to gas

Fingerprint

Dive into the research topics of 'A multistage coordinative optimization for sitting and sizing P2G plants in an integrated electricity and natural gas system'. Together they form a unique fingerprint.

Cite this