Abstract
Determining productivity targets based on actual potential for productivity improvement; is essential for fostering continuous improvement. Developing realistic and work specific productivity targets has proven a huge challenge in on-site construction. The present research exemplifies how work measurement techniques can be used to identify improvement potential and develop such targets. Two work measurement techniques; work sampling and continuous time study have been applied during a five day period, where the installation of prefabricated concrete elements have been observed at a single project case. The study revealed high fluctuations in daily utilization and productivity rates; moreover, a strong relationship between direct work and productivity at work task level were identified (R2 =.827). Additionally, four managerial strategies for improving productivity were identified: (1) Enhance production start and stops; (2) improve flows; (3) optimize utilization of manning and avoid absenteeism; (4) shield the production from weather. To develop a realistic productivity target, the observed productivity day-curves have been modified, by adjusting for effects of variation and declines in productivity, revealing an improvement potential of 19.4%. The present study demonstrates how realistic productivity targets can be developed to support managers’ and managerial decisions and thus act as a starting point for continuous improvement.
Original language | English |
---|---|
Journal | International Journal of Construction Management |
Volume | 24 |
Issue number | 15 |
Pages (from-to) | 1668-1678 |
Number of pages | 11 |
ISSN | 1562-3599 |
DOIs | |
Publication status | Published - 2024 |
Bibliographical note
Publisher Copyright:© 2023 Informa UK Limited, trading as Taylor & Francis Group.
Keywords
- construction management
- continuous improvement
- continuous time
- goal setting
- productivity targets
- Work sampling