Projects per year
Abstract
Slugging flow in the offshore oil & gas production attracts lot of attention due to it's limitation of production rate, periodic overload on processing facilities, and even direct cause of emergency shutdown. This work aims at two correlated objectives: (i) Preventing slugging flow; and meanwhile, (ii) maximizing the production rate at the riser of an offshore production platform, by manipulating a topside choke valve through a learning switching model-free PID controller. The results show good steady-state performance, though a long settling time due to the unknown reference for no slugging flow.
Original language | English |
---|---|
Title of host publication | Proceedings of the 19th World Congress of the International Federation of Automatic Control, IFAC 2014 |
Number of pages | 6 |
Publisher | IFAC Publisher |
Publication date | Aug 2014 |
Pages | 8522-8527 |
DOIs | |
Publication status | Published - Aug 2014 |
Event | 19th World Congress of the International Federation of Automatic Control, IFAC 2014 - Cape Town, South Africa Duration: 24 Aug 2014 → 29 Aug 2014 |
Conference
Conference | 19th World Congress of the International Federation of Automatic Control, IFAC 2014 |
---|---|
Country/Territory | South Africa |
City | Cape Town |
Period | 24/08/2014 → 29/08/2014 |
Series | I F A C Workshop Series |
---|---|
ISSN | 1474-6670 |
Keywords
- Offshore
- Oil & Gas
- Anti-slug
- Production-rate optimization
- Learning control
Fingerprint
Dive into the research topics of 'Learning control for riser-slug elimination and production-rate optimization for an offshore oil and gas production process'. Together they form a unique fingerprint.Projects
- 1 Finished
-
PDPWAC: Plant-wide De-oiling of Produced Water using Advanced Control
Yang, Z., Pedersen, S., Durdevic, P., Pedersen, J. K., N. Soltani, M., Stigkær, J. P., Aillos, A., Løhndorf, B. & Sørensen, P.
22/04/2013 → 31/12/2016
Project: Research