Projects per year
Abstract
This paper presents an operation strategy of energy hubs in the presence of electrical, heating, and cooling demand as well as renewable power generation uncertainties. The proposed strategy can be used for optimal decision making
of energy providers companies, as well as, other private participants of hub operators. The presence of electrical energy storage devise in the assumed energy hub can handle the fluctuations in the operating points raised by such
uncertainties. In order to modeling of hourly demands and renewable power generation uncertainties a scenario generation model is adopted in this paper. The considered energy hub in this study follows a centralized framework and
the energy hub operator is responsible for optimal operation of the hub assets based on the day-ahead scheduling. The simulation result illustrates that in the presence of electrical energy storage devices the optimal operation of hub assets can be attained.
of energy providers companies, as well as, other private participants of hub operators. The presence of electrical energy storage devise in the assumed energy hub can handle the fluctuations in the operating points raised by such
uncertainties. In order to modeling of hourly demands and renewable power generation uncertainties a scenario generation model is adopted in this paper. The considered energy hub in this study follows a centralized framework and
the energy hub operator is responsible for optimal operation of the hub assets based on the day-ahead scheduling. The simulation result illustrates that in the presence of electrical energy storage devices the optimal operation of hub assets can be attained.
Original language | English |
---|---|
Title of host publication | Proceedings of 2019 IEEE International Conference on Environment and Electrical Engineering and 2019 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe) |
Number of pages | 4 |
Publisher | IEEE Press |
Publication date | Jun 2019 |
Article number | 8783452 |
ISBN (Electronic) | 9781728106526 |
DOIs | |
Publication status | Published - Jun 2019 |
Event | 2019 IEEE International Conference on Environment and Electrical Engineering and 2019 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe) - NH Collection Genoa Marina Hotel, Genoa, Italy Duration: 11 Jun 2019 → 14 Jun 2019 Conference number: 19 https://www.showsbee.com/fairs/IEEE-EEEIC.html |
Conference
Conference | 2019 IEEE International Conference on Environment and Electrical Engineering and 2019 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe) |
---|---|
Number | 19 |
Location | NH Collection Genoa Marina Hotel |
Country/Territory | Italy |
City | Genoa |
Period | 11/06/2019 → 14/06/2019 |
Internet address |
Keywords
- Electrical energy storage
- Energy hub
- Stochastic programming
- Optimal operation
Fingerprint
Dive into the research topics of 'Optimal Operation of an Energy Hub in the Presence of Uncertainties'. Together they form a unique fingerprint.Projects
- 1 Finished
-
HeatReFlex: Green and Flexible District Heating/Cooling
Anvari-Moghaddam, A., Guerrero, J. M., Nami, H. & Mohammadiivatloo, B.
01/05/2019 → 30/04/2022
Project: Research