Power Production Experience from Wave Dragon Prototype Testing in Nissum Bredning: 2003 to 2005 – summary note

Peter Frigaard, Jens Peter Kofoed

Research output: Book/ReportReportResearch

548 Downloads (Pure)

Abstract

The first Wave Dragon prototype power production testing started May 2003 and ended temporarily primo 2005. In the mentioned period Wave Dragon was situated in a corner of Nissum Bredning with relative little amount of wave energy. Main purpose of the tests was demonstration of survivability and availability.
Original languageEnglish
Place of PublicationAalborg
PublisherDepartment of Civil Engineering, Aalborg University
Number of pages6
Publication statusPublished - 2005
SeriesHydraulics and Coastal Engineering
Number34
ISSN1603-9874

Bibliographical note

PDF for print: 8 pp.

Keywords

  • Wave Dragon
  • Wave Energy
  • Energy Converters
  • Nissum Bredning

Fingerprint

Dive into the research topics of 'Power Production Experience from Wave Dragon Prototype Testing in Nissum Bredning: 2003 to 2005 – summary note'. Together they form a unique fingerprint.

Cite this