Activities per year
Abstract
To overcome and eventually eliminate the existing heavy fossil fuels in the transport sector, there is a need for new renewable fuels. This transition could lead to large capital costs for implementing the new solutions and a long time frame for establishing the new infrastructure unless a suitable infrastructure is present. The system integration of synthetic fuels will therefore depend on the existing infrastructure and the possibility of continuing its exploitation to minimize the costs and maximize the use of the current infrastructure in place. The production process includes different steps and production plants, so it is important to implement it in the best manner possible to ensure an efficient and flexible system. The poster will provide an overview of the steps involved in the production of synthetic fuel and possible solutions for the system architecture based on the current literature and best practice.
Original language | English |
---|---|
Publication date | May 2013 |
Publication status | Published - May 2013 |
Event | Workshop on Electrolysis and CO2-recycling - Risø Campus, Roskilde, Denmark Duration: 9 Apr 2013 → 11 Apr 2013 |
Workshop
Workshop | Workshop on Electrolysis and CO2-recycling |
---|---|
Location | Risø Campus |
Country/Territory | Denmark |
City | Roskilde |
Period | 09/04/2013 → 11/04/2013 |
Fingerprint
Dive into the research topics of 'The system architecture for renewable synthetic fuels'. Together they form a unique fingerprint.Activities
- 1 Organisation or participation in workshops, courses, seminars, exhibitions or similar
-
Workshop on Electrolysis and CO2-recycling
Skov, I. R. (Participant)
9 Apr 2013 → 11 Apr 2013Activity: Attending an event › Organisation or participation in workshops, courses, seminars, exhibitions or similar