This dataset (.csv and .xlsx files) contains the measurements of temperature, relative humidity, absolute humidity, air pressure, airflow, water flow (water consumption) and energy use of a desiccant evaporative cooling system during operation in an office building located in Denmark during spring and summer 2022 (from the 8th of May 2022 to the 1st of September 2022) with a measurement time step of 30 seconds. This desiccant evaporative cooling system provides fresh air, cooling, heating and relative humidity regulation to condition a quarter of an office building (university building).
The main stated technical characteristics of this air handling unit with desiccant evaporative cooling (according to the manufacturer) are as follows:
- Nominal airflow rate: 15 000 m3/h.
- Maximum cooling power delivered to the building: 78 000 W.
- Minimum supply air temperature delivered to the building in cooling mode: 17 °C.
- Electrical use for fans, water treatment and humidifiers: 3 340 W.
- Heat use for cooling process at maximum load: 62 000 W.
- Evaporative cooling process power use at maximum load: 65 340 W.
- Water use for evaporative cooling process at maximum load: 81 Liter/h.
- Summer indoor temperature setpoint for cooling (ventilation regulation at room level): 23 °C.
The main stated technical characteristics of this air handling unit with desiccant evaporative cooling (according to the manufacturer) are as follows:
- Nominal airflow rate: 15 000 m3/h.
- Maximum cooling power delivered to the building: 78 000 W.
- Minimum supply air temperature delivered to the building in cooling mode: 17 °C.
- Electrical use for fans, water treatment and humidifiers: 3 340 W.
- Heat use for cooling process at maximum load: 62 000 W.
- Evaporative cooling process power use at maximum load: 65 340 W.
- Water use for evaporative cooling process at maximum load: 81 Liter/h.
- Summer indoor temperature setpoint for cooling (ventilation regulation at room level): 23 °C.
Date made available | 5 Mar 2024 |
---|---|
Publisher | Zenodo |
Temporal coverage | 8 May 2022 - 1 Sept 2022 |
Date of data production | 8 May 2022 - 1 Sept 2022 |
Geographical coverage | Aalborg, Denmark |
Emneord
- evaporative cooling
- desiccant evaporative cooling
- monitoring campaign
- building data measurements
- temperature
- relative humidity
- indoor environment
- energy
- water consumption
- Denmark
- Nordic climate
- colling system
- operational data
- HVAC
- air handling unit
-
Danish participation in ”IEA ECES Annex 85 “Indirect Evaporative Cooling”
01/01/2021 → 30/06/2025
Project: Research
-
-
IDCS: Instant District Cooling System
Johra, H., Jensen, R. L. & Pomianowski, M. Z.
01/09/2020 → 31/12/2021
Project: Research
Research output
- 3 Report
-
Instant District Cooling System: Project Results 2022
Johra, H., Jan 2023, Aalborg: Department of the Built Environment, Aalborg University. 52 p. (BUILD Contract Reports; No. 29).Research output: Book/Report › Report › Research
-
Instant District Cooling System: Project Results 2021
Johra, H., Dec 2021, Aalborg: Department of the Built Environment, Aalborg University. 27 p. (BUILD Contract Reports; No. 24).Research output: Book/Report › Report › Research
-
Instant District Cooling System: Project Study Case Presentation
Johra, H., Dec 2021, Aalborg: Department of the Built Environment, Aalborg University. 35 p. (DCE Technical Reports; No. 290).Research output: Book/Report › Report › Research
Open AccessFile79 Downloads (Pure)