Abstract

Building Information Modelling (BIM) is said to hold potential for increasing efficiency of the design processes in the building industry. However, designers struggle at times to apply the different BIM-tools. In order to understand this disjoint, it is necessary to understand first the existing practices of different specialists in the building design process in order to improve future development and implementation of BIM. The aim of this article is to investigate the consequences of using BIM-tools in a collaborative building design setting consisting of different specialists. A case study was carried out to trace when BIM-tools were used (or not) in an inter-organizational design process of a naval rescue station in Denmark. The design process was holistically examined through the lens of Activity Theory which is an analytical framework. Five key findings were identified: the mediating role of 3D visuals, real-world coupling with point cloud, rule-breaking to ensure design completion, inability to integrate BIM-analysis into the design and the use of heuristics to form and choose among design solutions.

Original languageEnglish
JournalConstruction Management and Economics
Volume37
Issue number6
Pages (from-to)336-350
Number of pages15
ISSN0144-6193
DOIs
Publication statusPublished - 3 Jun 2019

Fingerprint

Design process
Information modeling
Activity theory
Lenses
Industry
Organizational design
Rule-breaking
Denmark
Heuristics

Keywords

  • Building Information Modeling
  • Building information modelling
  • activity theory
  • building design
  • case study

Cite this

@article{0a80f4ea16734501a874662e7d2cd309,
title = "A holistic analysis of a BIM-mediated building design process using activity theory",
abstract = "Building Information Modelling (BIM) is said to hold potential for increasing efficiency of the design processes in the building industry. However, designers struggle at times to apply the different BIM-tools. In order to understand this disjoint, it is necessary to understand first the existing practices of different specialists in the building design process in order to improve future development and implementation of BIM. The aim of this article is to investigate the consequences of using BIM-tools in a collaborative building design setting consisting of different specialists. A case study was carried out to trace when BIM-tools were used (or not) in an inter-organizational design process of a naval rescue station in Denmark. The design process was holistically examined through the lens of Activity Theory which is an analytical framework. Five key findings were identified: the mediating role of 3D visuals, real-world coupling with point cloud, rule-breaking to ensure design completion, inability to integrate BIM-analysis into the design and the use of heuristics to form and choose among design solutions.",
keywords = "Building Information Modeling, Bygningsdesign, Casestudie, Aktivitet teori, Building Information Modeling, Building information modelling, activity theory, building design, case study",
author = "Peter Gade and Gade, {Anne N{\o}rkj{\ae}r} and Kathrin Otrel-Cass and Kjeld Svidt",
year = "2019",
month = "6",
day = "3",
doi = "10.1080/01446193.2018.1533644",
language = "English",
volume = "37",
pages = "336--350",
journal = "Construction Management and Economics",
issn = "0144-6193",
publisher = "Routledge",
number = "6",

}

A holistic analysis of a BIM-mediated building design process using activity theory. / Gade, Peter; Gade, Anne Nørkjær; Otrel-Cass, Kathrin; Svidt, Kjeld.

In: Construction Management and Economics, Vol. 37, No. 6, 03.06.2019, p. 336-350.

Research output: Contribution to journalJournal articleResearchpeer-review

TY - JOUR

T1 - A holistic analysis of a BIM-mediated building design process using activity theory

AU - Gade, Peter

AU - Gade, Anne Nørkjær

AU - Otrel-Cass, Kathrin

AU - Svidt, Kjeld

PY - 2019/6/3

Y1 - 2019/6/3

N2 - Building Information Modelling (BIM) is said to hold potential for increasing efficiency of the design processes in the building industry. However, designers struggle at times to apply the different BIM-tools. In order to understand this disjoint, it is necessary to understand first the existing practices of different specialists in the building design process in order to improve future development and implementation of BIM. The aim of this article is to investigate the consequences of using BIM-tools in a collaborative building design setting consisting of different specialists. A case study was carried out to trace when BIM-tools were used (or not) in an inter-organizational design process of a naval rescue station in Denmark. The design process was holistically examined through the lens of Activity Theory which is an analytical framework. Five key findings were identified: the mediating role of 3D visuals, real-world coupling with point cloud, rule-breaking to ensure design completion, inability to integrate BIM-analysis into the design and the use of heuristics to form and choose among design solutions.

AB - Building Information Modelling (BIM) is said to hold potential for increasing efficiency of the design processes in the building industry. However, designers struggle at times to apply the different BIM-tools. In order to understand this disjoint, it is necessary to understand first the existing practices of different specialists in the building design process in order to improve future development and implementation of BIM. The aim of this article is to investigate the consequences of using BIM-tools in a collaborative building design setting consisting of different specialists. A case study was carried out to trace when BIM-tools were used (or not) in an inter-organizational design process of a naval rescue station in Denmark. The design process was holistically examined through the lens of Activity Theory which is an analytical framework. Five key findings were identified: the mediating role of 3D visuals, real-world coupling with point cloud, rule-breaking to ensure design completion, inability to integrate BIM-analysis into the design and the use of heuristics to form and choose among design solutions.

KW - Building Information Modeling

KW - Bygningsdesign

KW - Casestudie

KW - Aktivitet teori

KW - Building Information Modeling

KW - Building information modelling

KW - activity theory

KW - building design

KW - case study

UR - http://www.scopus.com/inward/record.url?scp=85059001492&partnerID=8YFLogxK

U2 - 10.1080/01446193.2018.1533644

DO - 10.1080/01446193.2018.1533644

M3 - Journal article

VL - 37

SP - 336

EP - 350

JO - Construction Management and Economics

JF - Construction Management and Economics

SN - 0144-6193

IS - 6

ER -